In response to heavy rainfall, Taiwan Railway announced on August 24, 2026, that all reserved seat trains on the South Link Line and the Eastern Trunk Line would be suspended before 18:00 on the same day. This operational adjustment was made to ensure safety during the heavy rain.

Meanwhile, Taiwan Railway stated that local trains operating on the affected South Link and Eastern Trunk lines would run dynamically. The operation of these local trains will be adjusted flexibly depending on actual rainfall conditions. Passengers are advised to pay close attention to the latest train status updates before traveling.